Archive

This project consists of ~126,000 square feet in additions and ~ 102,000 square feet in heavy renovations. Major demolition will occur when tearing down a large portion of the existing school, which will be where ~ 88,000 square feet will be built back. This project...

The Science & Engineering Building Project will be located at 329 East Second Street, Morehead, KY 40351. The building will consist of space for the core science and engineering programs MSU requires construction of an approximately 124,000 gross square feet minimum facility as defined in...

Work of the Project includes Building and Site Work for the construction of a new 349,848 sf Henry Clay High School designed for 2300 students. This high school will be constructed of masonry veneer on ICF, CMU and CIP concrete walls with areas of metal...

This project involves the comprehensive renovation of both the theater/auditorium and science labs, as well as renovation of an existing elevator and construction of a new elevator. The objective is to create modern, functional, and safe spaces that meet the educational and performance needs of...